Reinforcing of large gas-concrete panels from an autoclave
Автор: Alyabyeva Darya Antonovna
Журнал: Строительство уникальных зданий и сооружений @unistroy
Статья в выпуске: 8 (35), 2015 года.
Бесплатный доступ
An emergency conditions report is used as a case study of the destruction of gas-concrete panels. An expert conclusion states that the destruction of the wall panels was caused by a regulation violation of anti- corrosion coating of rebar cages in cellular concrete structures and the lack of quality control of wall panels at the manufacturing facility. This caused the increased corroded material build up. In the case study, the circumstances are considered from a different angle than in the independent expert’s report. The study considers a version of the cellular concrete wall panel destruction caused by micro-cracks developed as a result of the violation of the thermo-moist regime which led to -frost weathering‖: the process of the destruction of a material because of frost heaving of the internal moisture. In order to prevent such effects, DSK-1 has adopted the technology of a two- layer wall type with an -aerated‖ or -moist‖ facade system.
Cellular concrete, gas concrete, autoclave, fittings shadows, reinforcement
Короткий адрес: https://sciup.org/14322273
IDR: 14322273