The analysis of factors of high-speed unit construction technology advancement
Автор: Sychev S.A.
Рубрика: Технология и организация строительного производства
Статья в выпуске: 1 т.16, 2016 года.
Бесплатный доступ
The paper deals with engineering solutions from modules of different types and modifications of advanced factory readiness from composite structures. It’s explained by a large variety of construction projects. The formation of a time-saving method of construction consists in the search of rational solutions by time-series techniques on the organizational and technological structure. The author describes in terms of quantity components of this structure. The process of selecting the most effective solutions according to the accepted in the study criteria is formalized. The problem of choosing an optimal solution from the finite number of technologies by the expert evaluation method is considered. As a result of the research study two scientific problems are solved. First of all, the factors which influence the advancement of high-speed erection of prefabricated buildings are specified. Secondly, the importance and priority of these factors effecting the building installation from high-tech units are appreciated.
Prefabricated structures, rapid construction, block-modules, modular buildings, room units
Короткий адрес: https://sciup.org/147154445
IDR: 147154445 | DOI: 10.14529/build160105