Concept of organizational-economic modeling of low-capacity manufacturing construction zero cycle

Бесплатный доступ

The article describes the concept and the method of calculating the optimal parameters of production of low-volume work, which makes possible to calculate the optimum sizes of machines, technology parameters. In comparison with the traditional method there is a reduction in production costs in the layout of the cargo and earthwork operations on the territory of planned construction by 1.8%, with the laying of small underground pipelines - by 60.7% and in the construction of access roads and footpaths - by 40.3%.