On the issue of carrying out a complex of geological and technical measures at the Muravlenkovskoye field

Бесплатный доступ

The Muravlenkovskoye field has been developed since 1982, it is currently in operation with a complex of geological and engineering measures: various types of physical and chemical treatments in the bottomhole formation zone, hydraulic fracturing, perforation works, transfer of wells to another horizon, injectivity profile alignment using different compositions, unsteady flooding.

Geological and technical measures, muravlenkovskoye field, oil, enhanced oil recovery, production intensification

Короткий адрес: https://sciup.org/140237093

IDR: 140237093

Статья научная