Evaluation of the project of turbine reconstruction with industrial steam extraction

Бесплатный доступ

The article analyzes PT-135-130/13 turbine work installed in Krasnoyarsk TTP-2, with no industrial steam extraction and low efficiency. Various schemes for its reconstruction determining technical and economic parameters are studied. The optimum scheme of reconstruction is suggested.

Thermal circuit, turbine, industrial steam extraction, reconstruction, economic efficiency, technical and economic performance, alternatives, optimal reconstruction

Короткий адрес: https://sciup.org/142142914

IDR: 142142914

Статья научная