Estimation of system of ore transportation while mining apatite-nepheline fields

Бесплатный доступ

The paper describes results of technical-and-economical comparison of some transportation system options for apatite-nepheline haulage from the Partomchorr deposit to the "Oleni Ruchei" processing plant. The reasonable mining-and-transportation system considering mining-and-geological characteristic of the area has been introduced.

Deposit, mining-and-transport system, tunnel, railway, conveyer, electric locomotive, capital expenses, operating expenses, producing costs

Короткий адрес: https://sciup.org/14294395

IDR: 14294395

Статья научная