Determination of the minimum length and width of the quarry field in the development of horizontal reservoir deposits

Автор: Khakimov Shodiboy Ikhmatullaevich, Tadzhiev Shukhrat Tulkinovich, Kobilov Olimjon Sirojovich

Журнал: tecHика.

Статья в выпуске: 3, 2020 года.

Бесплатный доступ

Methods have been developed for engineering calculations to determine the size of the working area of quarry fields, with various technological schemes for the development of low-power multi-layer deposits of horizontal and flat occurrence.

Pit contour, size of working zones, technological schemes, specific operating costs, intra-pit transport, structure of mining and capital expenditures, pit depth, ore reservoir capacity, value of the guiding slope, мощность рудного пластa

Короткий адрес: https://sciup.org/14125816

IDR: 14125816   |   DOI: 10.24411/2181-0753-2020-10022

Статья научная