Implementation of a binary cycle as a part of the condensation К-300-240 LMP steam turbine cooled by water at a temperature of 5°С

Автор: Zainullin R.R., Gafurov A.M.

Журнал: Форум молодых ученых @forum-nauka

Статья в выпуске: 5 (9), 2017 года.

Бесплатный доступ

Binary power installation in structure of the condensation К-300-240 steam turbine of LMP (Leningrad Metal Plant) cooled by water at an admissible temperature in 5°С in a winter time span is considered.

Thermal power station, steam turbine, binary cycle, low-boiling working fluid

Короткий адрес: https://sciup.org/140278760

IDR: 140278760

Статья научная