Implementation of a binary cycle as a part of the powerful condensation steam turbine К-1200-240-3 LMP cooled by water at a temperature of 5°С
Автор: Zainullin R.R., Gafurov A.M.
Журнал: Форум молодых ученых @forum-nauka
Статья в выпуске: 5 (9), 2017 года.
Бесплатный доступ
Binary power installation in structure of the powerful condensation К-1200-240-3 steam turbine of LMP cooled by water at an admissible temperature in 5°С in a winter time span is considered.
Thermal power station, steam turbine, binary cycle, low-boiling working fluid
Короткий адрес: https://sciup.org/140278763
IDR: 140278763
Статья научная