Implementation of a binary cycle as a part of a extraction turbine PT-135/165-130/15 TMP at an temperature of the cooling water in 18°С
Автор: Gatina R.Z., Zainullin R.R.
Журнал: Форум молодых ученых @forum-nauka
Статья в выпуске: 6 (10), 2017 года.
Бесплатный доступ
Mode of work of binary power installation as a part of a extraction turbine PT-135/165-130/15 TMP (Turbomotor plant) at an admissible temperature of the cooling water in 18°C for a summer time span is considered.
Combined heat and power plant, steam turbine, binary cycle, low-boiling working fluid
Короткий адрес: https://sciup.org/140279078
IDR: 140279078
Статья научная