Implementation of a binary cycle as a part of a extraction turbine PT-135/165-130/15 TMP at an temperature of the cooling water in 12°С

Автор: Gatina R.Z., Zainullin R.R.

Журнал: Форум молодых ученых @forum-nauka

Статья в выпуске: 6 (10), 2017 года.

Бесплатный доступ

Mode of work of binary power installation as a part of a extraction turbine PT-135/165-130/15 TMP (Turbomotor plant) at an admissible temperature of the cooling water in 12°C for a direct-flow water supply system is considered.

Combined heat and power plant, extraction turbine, binary cycle, low-boiling working fluid