Implementation of a binary cycle as a part of a extraction turbine Т-250/300-240-2 TMP at an temperature of the cooling water in 12°С
Автор: Gafurov N.M., Zainullin R.R.
Журнал: Форум молодых ученых @forum-nauka
Статья в выпуске: 6 (10), 2017 года.
Бесплатный доступ
Mode of work of binary power installation as a part of a extraction turbine Т-250/300-240-2 TMP (Turbomotor plant) at an admissible temperature of the cooling water in 12°C for a direct-flow water supply system is considered.
Combined heat and power plant, extraction turbine, binary cycle, low-boiling working fluid
Короткий адрес: https://sciup.org/140279109
IDR: 140279109
Статья научная