Responsibility for the non-compliance with requirements to the result of design and survey works

Автор: Chikisheva Nadezhda Aleksandrovna

Журнал: Власть @vlast

Рубрика: Экспертиза

Статья в выпуске: 2, 2016 года.

Бесплатный доступ

The result of design and survey works can be a basis of the relation of the parties in capital construction, and determines the operation of constructed facilities. Survey works are the first step of understanding the real possibilities of the embodiment of the idea in a certain place. The second step leads to a design that is possibilities of realization of the idea in a particular form with reference to the concrete place. And if the place allows to realize the idea, then it has been realized - the object has been built. In the theory and in practice people are limited by the contract for design and survey work as a simple contract variations or a component part of the construction process. Relations on the design and survey have been neglected, and it is a reason for the lack of scientific elaboration of this institution.

Еще

Survey works, design, improper performance of contract, responsibility, construction contract

Короткий адрес: https://sciup.org/170168305

IDR: 170168305

Статья научная