Challenges of construction mining plant
Автор: Seko Evgeniy Valerievich, Urunov Timur Shermuhammadovich
Журнал: Строительство уникальных зданий и сооружений @unistroy
Статья в выпуске: 7 (46), 2016 года.
Бесплатный доступ
Objective of the study show the reject disposal problem in the mining industry. In this year the plant reported a decrease in the output of nickel and copper in the plant's concentrate compared to last year's, with was due to overall deterioration in the quality of the processed ores. The main factor causing reduction output was lower supply of feedstock. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study showed main factor causing reduction output was lower supply of feedstock but the metals demand goes up. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study proposed the evaluation of the possible volume of construction enterprises in the industry in the near future.
Building, investment, mining, construction sector, copper
Короткий адрес: https://sciup.org/14322348
IDR: 14322348