Prevention ways of BHA sticking to the wall of well
Автор: Gerzhberg Yu.M., Kirshin V.I., Kuligin A.V., Kuznetsov N.I., Gorbikov A.N.
Журнал: Известия Коми научного центра УрО РАН @izvestia-komisc
Рубрика: Технические науки
Статья в выпуске: 3 (15), 2013 года.
Бесплатный доступ
We consider prevention issues of BHA sticking as a result of its sticking to the well wall. The technological decisions on repeated reduction of the area of BHA contact with a clay crust by use of intermediate basic elements of different de- sign which have the diameter bigger than the weighted pipes, but smaller than the chisel are provided. On the basis of calculations of the intense - deformed condition of BHA in the space limited to well walls, we received the depend- ences defining placement of basic elements depending on a ratio of diameters of pipes and basic elements, and an antiaircraft corner of a rectilinear site of well.
Sticking prevention, intermediate stool, bha, sticking
Короткий адрес: https://sciup.org/14992630
IDR: 14992630