A rational approach to organization of work on the construction of monolithic standard floor

Автор: Kosilov Ivan Aleksandrovich, Morozova Tatiana Fedorovna, Junussov Bahyt Askarovich, Svanov Timur Svanovich

Журнал: Строительство уникальных зданий и сооружений @unistroy

Статья в выпуске: 5 (32), 2015 года.

Бесплатный доступ

Recent results of monolithic construction of residential buildings were wave advance. The main aim is to organize the construction of monolithic buildings is a solution amount grip on the floor for accurate construction.It should be understood, how can affect the choices on the technical and economic indicators. The necessary for this improvement is organization of monolithic construction. Investigation calculated that the cost activity duration. The scheme of operation of formwork panels with minimal downtime. Defined involvement of the tower crane and other equipment at every part of building frame assembly of the building.From time engagement technology depends largely on the main technical and economic indicators. All this is designed in this paper. The article shows how to select the number of grip and set formwork systems affects the amount and duration of work as well as additional labor and technical resources.

Еще

Set of formwork, duration, calculation method, cost, standard floor, risk

Короткий адрес: https://sciup.org/14322258

IDR: 14322258

Статья научная