Integration of the dispatched subsystem with equipment (example of machine-building enterprise)
Автор: Soloveichik K.A.
Журнал: Известия Санкт-Петербургского государственного экономического университета @izvestia-spgeu
Рубрика: Экономика предприятий, регионов и отраслей
Статья в выпуске: 5 (107), 2017 года.
Бесплатный доступ
As a result of the development of the algorithm of the production dispatching module at the machine-building enterprise with the purpose of increasing the economically effective depth of the redistribution, the algorithm for dispatching a subdivision of a machine-building enterprise with the possibility of integration with machine tool equipment on the basis of software products developed on the platform "1С: Enterprise 8" was first developed to track the availability of the production process. The algorithm is characterized by a high degree of speed calculations on a large amount of data.
Process stage quotient, depth redistribution, management processes, mechanical engineering, industrial production management
Короткий адрес: https://sciup.org/14875930
IDR: 14875930