Resource-index method for determining the estimated cost of construction: features and ways of improvement
Автор: Bovsunovskaya M.P., Reinikova T.A., Chuzhmakova E.I.
Журнал: Вестник Алтайской академии экономики и права @vestnik-aael
Рубрика: Экономические науки
Статья в выпуске: 9-2, 2024 года.
Бесплатный доступ
As the basis for determining the initial (maximum) prices of contracts, the estimated construction cost should be determined in a transparent and understandable way for all participants in the pricing process. The article analyzes the purpose and already accumulated experience of using the resource method, which has been actively used in the subjects of the Russian Federation for more than a year. The authors analyze the differences between the method and the previously widespread basic index method in terms of approaches to determining the estimated cost, the application of estimated standards and current prices of construction resources. Based on the results of the analysis, the authors propose solutions to improve the resource-index method.
Estimated cost of construction, current prices, resource index method, improvement
Короткий адрес: https://sciup.org/142242396
IDR: 142242396 | DOI: 10.17513/vaael.3716