Expense's reduction and increase the quality of work within installation of cement plug barrier
Автор: Palamodov K.E., Prokoptsev R.N.
Журнал: Международный журнал гуманитарных и естественных наук @intjournal
Рубрика: Науки о земле
Статья в выпуске: 2-1 (77), 2023 года.
Бесплатный доступ
This article evaluates the work with bridge cement plug in open hole (further in the text BCP): segregation cement bridge; supported cement plug and cement bridge for tackling the well's failure. Analysis of idle time, comparison of existing techniques that can be used, more cost-effective methods.
Drilling, well construction, work with cement plug, increase of production efficiency, cost effectiveness, viscous-elastic mixture, idle time, mud loss control
Короткий адрес: https://sciup.org/170198169
IDR: 170198169 | DOI: 10.24412/2500-1000-2023-2-1-16-21