Technical decisions and design of modern compensated converting substation of oil and gas extraction complex

Бесплатный доступ

A new circuit decision of compensated converting substation for power supply of boring installations of an oil and gas extraction complex is shown. In the packet MATLAB 7.5 a model has been developed and simulation of electromagnetic processes in the power supply system of different frequency consumer of an alternating current has been carried out. Basic design decisions accepted while working out the substation are described.

Моделирование в matlab, different frequency consumers, simulation in matlab, compensated converting substation

Короткий адрес: https://sciup.org/147158068

IDR: 147158068

Статья научная