Renewable resources accounting in integer models of project scheduling

Бесплатный доступ

In complicated complexes of operations scheduling renewable resources are assumed by constants that does not always agree with practice of management. Determining of renewable resources as not stored (type “power”) which non-use leads to their loss, does not fully reflect their specificity. Formalizing of redistribution of renewable resources is linked to representation conditions of their usage in models. Redistribution of resources is considered on an example of network model for minimizing an unbalance of resources at set directive times for completion scheduling.

Project, network models, scheduling, renewable resources

Короткий адрес: https://sciup.org/143180997

IDR: 143180997   |   DOI: 10.24412/2073-0667-2023-1-5-11

Статья научная