Measuring the Effect of CMMI Quality Standard on Agile Scrum Model
Автор: Munawar Hayat, M. Rizwan Jameel Qureshi
Журнал: International Journal of Information Engineering and Electronic Business(IJIEEB) @ijieeb
Статья в выпуске: 6 vol.7, 2015 года.
Бесплатный доступ
Agile development gets more appreciation from the market due to its flexible nature and high productivity. Scrum provides better management of the processes as compared to other agile modes. Scrum model has several features and strengths but still it lacks in engineering practices and quality. This research deals with the improvement of Scrum processes for better management and quality of software using the infusion of different practices from internationally renowned capability maturity model integration (CMMI) quality standard. Survey is used as a research design to validate the proposed framework. Statistical analysis shows that there is a profound effect on Scrum model due to the proposed research developing high quality software.
Scrum, Agile, CMMI, quality, product backlog, Sprint backlog
Короткий адрес: https://sciup.org/15013381
IDR: 15013381
Текст научной статьи Measuring the Effect of CMMI Quality Standard on Agile Scrum Model
Published Online November 2015 in MECS DOI: 10.5815/ijieeb.2015.06.07
Agile methods are introduced in software industry to develop products to satisfy customers as per changing requirements in short time, cheaper cost and without sacrificing quality [1]. It is still being explored by researchers even further improvements are reported about the applicability of agile methods and practices [1]. The well-known existing agile methodologies are Crystal, Extreme Programming (XP), Dynamic Systems Development Methods (DSDM), Feature driven development (FDD) and Lean software development [2]. Extreme Programming (XP) emphasizes to develop projects successfully with high quality working in pairs. XP has many advantages like short iterations, communication with customer on the spot, constant integration and testing. Weak documentation is an issue that is faced in XP methodology to use it for development of medium/large and reengineering projects. FDD supports to work individually rather than team’s work. Lean methodology tailors software processes according to organizational needs. It focuses return over investment (ROI) and cost of project but it does not specify how to achieve high performance and collect requirements in advance [2].
Scrum is widely used in different companies [1].
Список литературы Measuring the Effect of CMMI Quality Standard on Agile Scrum Model
- K. Schwaber, "Agile Project Management with Scrum", Microsoft Press, 2004.
- Marchenko A., Abrahamsson P., "Scrum in a Multiproject Environment: An Ethnographically-Inspired Case Study on the Adoption Challenges", Agile, 2008, AGILE '08, 4-8 Aug. 2008, pp. 15-26.
- Cristal M., D. Wildt, R. Prikladnicki, "Usage of SCRUM Practices within a Global Company", In IEEE International Conf. on Global Software Engineering, 2008. ICGSE 2008, 17-20 Aug. 2008, pp. 222-226.
- I. Krasteva, S. Ilieva, "Adopting an agile methodology: why it did not work", In Proc. of International Conf. on Software Engineering archive, in Proc. of the 2008 international workshop on Scrutinizing agile practices or shoot-out at the agile corral, APSO'08, Leipzig, Germany, May 10, 2008, pp. 33-36.
- Ken H. Judy, Ilio Krumins-Beens, "Great Scrums Need Great Product Owners: Unbounded Collaboration and Collective Product Ownership", In Proc. of the 41st Hawaii International Conf. on System Sciences – 2008, IEEE 2008, pp. 1-10.
- Isham, Agile Architecture IS Possible You First Have to Believe!, In Proc. of Agile conf., 2008. AGILE '08, 4-8 Aug. 2008, pp. 484-489.
- Edward Uy, René Rosendahl, "Migrating From SharePoint to a Better Scrum Tool", Agile 2008 Conference, IEEE 2008, pp. 506-512.
- Richard Lyon, Marcus Evans, "Scaling Up - pushing Scrum out of its Comfort Zone", In Proc. of Agile 2008 Conference, IEEE 2008, pp. 395-400.
- Edward Uy, Nikos Ioannou, "Growing and Sustaining an Offshore Scrum Engagement", Agile 2008 Conference, IEEE 2008, pp. 345-350.
- Tamara Sulaiman et al, "Agile EVM – Earned Value Management in Scrum Projects", In Proc. of AGILE 2006 Conf. (AGILE'06), IEEE, 2006.
- Alf B?rge Bj?rdal Lerv?g, "A Case Study of a Norwegian Scrum Project", Norwegian University of Science and Technology Department of Computer and Information Science, 2006.
- CMMI Product Team, Capability Maturity Model Integration, Version1.2, CMU/SEI-2006-TR-008 ESC-TR-2006-008, August 2006.