The methodology of estimation of isolation resources under operation to set equivalent work cycle of cables 6(10) kV

Бесплатный доступ

The methodology and mathematical model of collecting data, analysis and forecasting information about cables 6 (10) kV production time are given. The model is based on statistical analysis of power cables isolation in city network systems

Power cable, isolation, forecasting, statistical analysis

Короткий адрес: https://sciup.org/147158075

IDR: 147158075

Краткое сообщение