Features of determining the cost of design works
Автор: Gorelova A.V.
Журнал: Экономика и социум @ekonomika-socium
Статья в выпуске: 8 (39), 2017 года.
Бесплатный доступ
In the article features of definition of cost of designing on directories of base prices for design works are considered. The profit of the organization depends on the volume and cost of the work performed, as a result, a comprehensive cost estimate for the sections of the project documentation being developed is required. For hazardous industrial facilities that are subject to registration in the state register, additional sections of the project documentation are developed, containing an assessment of the risks of emergencies and measures for localization and elimination of the consequences of the accident.
Project documentation, working documentation, reference price lists, hazardous production facilities, base price, author''s supervision
Короткий адрес: https://sciup.org/140235656
IDR: 140235656