Development advanced manufacturing development plan to improve the economic and financial condition of the company non-metallic building materials

Бесплатный доступ

Considers the current state of the industry of extraction and production of nonmetallic building materials, from which it was concluded that the consumption of non-metallic building materials grows every year. This is primarily due to increased volumes of construction. On the example of the company non-metallic building materials a study of the activities of the mining and processing of non-metallic building materials. When considering business enterprise, identified the major economic and financial problems of the enterprise. Based on the studied indicators, determined the profitability of products as very low, the turnover of working capital insufficient. To solve the main problems of the enterprises of the company non-metallic building materials offered the long-term production development plan, consisting of measures to reduce costs and improve production efficiency and raw material extraction. To determine the economic efficiency of each proposed project calculated a NPV (net present value) for each of the events. To determine the maximum effectiveness of proposed projects used the method of optimization of the selection of an investment project using linear programming. Defined restrictions on investment projects, which is the availability of own funds according to the years of project implementation. The following results are obtained: the company non-metallic building materials is capable of 1, 3 and 4 projects over the next 3 years. Due to the high level of expenses necessary to investment for the implementation of the second project the company should delay its implementation for 4 years. By operating according to this perspective industrial development plan, the plant will be able to improve its financial performance, reduce costs, and improve the economic efficiency of production. After four years, the company will have the ability to implement a project on reconstruction of the factory for washing and grinding of gravel, replacement of transmission units products. This method of determining the prospective development plan developed and applied on the example of "Tuchkovo building materials plant".

Еще

Non-metallic building materials, companies, economic indicators, investment projects, linear programming, optimization, selection

Короткий адрес: https://sciup.org/140215874

IDR: 140215874   |   DOI: 10.17073/2500-0632-2016-3-45-52

Статья научная