Modern problems of the pricing formation system for the formation of estimate value in the territory of the Russian Federation
Автор: Vlasova G.A., Knyazeva N.V., Shindina T.A.
Журнал: Сибирский аэрокосмический журнал @vestnik-sibsau
Рубрика: Экономика
Статья в выпуске: 1 т.19, 2018 года.
Бесплатный доступ
Currently, among the most pressing problems in the system of pricing in the construction industry is the outdated base of estimates and rates. Both private investors and the state, that are the customers of construction works, are in- terested in determining the reliable cost of the project when preparing the estimate documentation. After all, in the con- ditions of economic instability for construction companies and the industry as a whole, the key point of development is the reduction of the cost of construction products. The main problems of rationing and determination of the cost of the basic construction resources are considered in the article, and the tasks of reforming the existing database of estimated standards are formulated. Based on the results of timekeeping, standards and quotations for construction work on mod- ern technologies have been developed. The necessity of actualization of the base and transition to the resource method of the estimated pricing is proved.
Investment and construction project, estimated cost of construction, estimated norms and prices, cost of resources in construction, resource method for estimating the estimated cost, timing of construction processes
Короткий адрес: https://sciup.org/148177793
IDR: 148177793