Resource allocation type power based on generalized problem on the “edit”

Бесплатный доступ

Formulation of the problem. Management of construction companies involves preparatory activities prior to the construction of the object. And this training is twofold: on the one hand, the need to prepare for the construction of enough complex in an engineering sense, object, on the other - it is necessary to prepare specific construction companies to participate in construction of the facility at a given time and place. That is necessary to determine at what time, by what means and by what companies will perform the work, provided estimates for the construction of the facility. Results. The problem of the formation the production program of building pre-acceptance at various variants of the selection of organizational and technological solutions to ensure compliance with the contractual terms of performance of the program is considered. In the case where this is not possible, the part of the object or individual works, transferred to third parties, which is accompanied by additional costs. An algorithm based on the generalization of the classic “Editor” tasks allowing to identify options that provide a minimum of cost is proposed. Conclusions. We obtain algorithms for solving optimization problems of the volume of work with several types of resources, as an analogue of the classical problem of processing parts on the machines and for their solutions modification of the method of dynamic programming (the generalization to the case of several constraints) is proposed.

Еще

Resources such as power, production program, project, task "editor", an enlarged range of works, additional costs, organizational and technological solutions, network graph, matrix method for calculating the flow

Короткий адрес: https://sciup.org/147155178

IDR: 147155178   |   DOI: 10.14529/ctcr170209

Статья научная