Decision which is providing of effective moving of limit of water and gas in Northern Nishan mine
Автор: Niyazova Naima
Журнал: Теория и практика современной науки @modern-j
Рубрика: Основной раздел
Статья в выпуске: 3 (9), 2016 года.
Бесплатный доступ
Results of Northern Nish an mine, in other words, in layer has change of pressure and decision of providing of effective mooring of limit of gas-water, counting of determination of technological parameter and gas-hydrodynamic of management of object, according to maked result is based in other words change of pressure of layer and according to moving of limit of gas-water throng making of decision is organized chance. This position changes change of region of using mines, so it increases chance of digging in watery layer.
Planed diging, amout of gas, period of control, doing of plan, scale of quality, using of time, pressure of layer
Короткий адрес: https://sciup.org/140268385
IDR: 140268385
Текст научной статьи Decision which is providing of effective moving of limit of water and gas in Northern Nishan mine
Manager effects change process directed which, it wants. Consequence, parts should be that manager effects. In reception process resource which selected managers effect practical resource.
Above mentions, in Northern Nish an mine we learn about decision which effective limit of providing optimum regime.
We tell about in operation regime appearance of improving exercise quality of indication of administration which connected in operation regime being optimum of exercise with quality of indication at the same time.
We can indicated quality of scale: T
JU WI P ( x n ’ t ) - P i ( x n ’ t )] dsdt [1]
10 П there is P1 (xn, t)- in layer, function of saving of gas state, t0, T -make use of time П -fields.
We should consider which is solving optimum management type of technical economic limit. There is q v mn - q v - q v max —limit of debit of each well, v -the number of wells, q v mn , q v max upper and down determined valve of normal technological regime of working of every well.
Pressure of layer limit.
П
P i,j > P lmin , Z q , ( t ) < Q Pan [2]
V = 1
Testing time beginning of a full day, week, month, year, in real condition layer, gas pressure manager system of determination collection of parameter.
We can divide conditionally following groups; internal parameter, side of indication of side which counting parameter and eternal environment parameters.
We choose to purpose following factors:
X5 = (T -1)I T, x6 = Q I Qcurren, there is Qpton - planed digging Qac - quantity of gas in control time, kot - coefficient of group in last time, Qbeg - collection prophetic size of consumption in control time Q -to beginning of control time from now, present collection of digging gas AQplan - working plan during in last control time
( A Qplan >0)not Working ( A QpiQn <0).
Using of practical system consist in following stages:
-
> analyzing of management and decision in condition
-
> optimizing of collection of preparation process indication of digging regime
Following condition begins last prediction compared with real regime indications base on checking of model of object. If there have high differences between counting and real indication. It is suited models. After { xt } factor of space of analysis is counted.
Decision concerns conditionally question of automatic separation, it is used inconsequence learning
Following condition concerns one of classes
-
> Digging regime is not recommended to change
-
> Digging regime is recommended to suit
-
> Using of chance (change of well regime) is recommended
-
> Using of supply chances and gigging regime is recommended to suit
In the first picture, about results, which decision general block is.

1-picture. Reaching of solution.
When change of digging regime is decided after. If critical position does not happen. But sometimes, you can change idea of the best regime
In special position daily practice using of regime which support of being of minimum spending, in other position, becoming less of passing side of well in water layer
During in digging time, responsible person can demand list of minimum regime, when he should count requirement which we learn about problem of manage of gas-water limit, for the purpose of decision in Northern Nathan well
In conclusion, we can decide to being affective of moving of change of gas-water limit and debit in near border of well.
Список литературы Decision which is providing of effective moving of limit of water and gas in Northern Nishan mine
- Konovalov A.N. Tasks problems of filtering multiphase incompressible fluid.-Novosibirsk: Science, 1988.-166 page.
- Marchuk G.I. Methods of calculus mathematics.-M.: Nedra, 1977.-456 page.
- Katkovnik V.Y. Nonparametric identification and data smoothing.-M: Science, 1985.-408 page.
- Jakbarov O.O. Models and optimal algorithm of controlling filtering system: Dus…kand. Tech. science.- Tashkent. AHRUz IK, 2004.-138 page.