Study of pumping stations in Nakhchivan Autonomous Republic

Бесплатный доступ

Reconstruction of reclamation and irrigation systems, construction of modern hydrotechnical facilities are kept in mind in the autonomous republic. Improving soil water supply contributes to high productivity in agriculture and food security, the demand is met by local production. In accordance with the Action Plan on increasing the fertility of agricultural lands in the Nakhchivan Autonomous Republic, works in this area are being continued, new pumping stations are being built, and land plots are being cultivated.

Pumping station, water pipeline, water channels, water pumps, meloration and irrigation system

Короткий адрес: https://sciup.org/170203838

IDR: 170203838   |   DOI: 10.24412/2500-1000-2024-3-2-150-155

Список литературы Study of pumping stations in Nakhchivan Autonomous Republic

  • Azizov A.H., Rahimov A.M., Hajiyeva I.Y., Heydarov H.A. Volumetric hyd-raulic transmissions and hydraulic automation. (Methodical instructions for com-pleting graduation and course projects). ADNA, Baku, 2003. - 97 p.
  • Huseynov S.O., Guliyev A.H., Hydraulic machines and hydroelectrics. Baku, 2000, 238 p.
  • Sveshnikov V.K. "Publisher's Center" Tekinform" MAI". 2001. - 360 c.
  • Sveshnikov V.K. Gidrooborudova. International directory. Book 2. Hydraulic equ-ipment.
  • Sveshnikov V.K. Gidrooborudova. International directory. Book 3.
  • Gurbanov R.S., Gurbanova T.H. The method of operation that creates the packer effect without a packer // Scientific works of NQGPKETI, VOLUME XV. - Baku, 2014. - P. 50-54.
  • Gurbanova T.H. Study of the liquid-gas mixture in the well body // Scientific works of NQGPKETI, VOLUME XV. - Baku, 2014. - P. 55-57.
  • Gurbanov R.S., Gurbanova T.H. The method of integral modeling of the oil-gas-well system // Scientific works of NQGPKETI, VOLUME XV. - Baku, 2014. - P. 250-259.
  • Gurbanly R.S., Gurbanov Ra.S., Gurbanova T.H. New method of studying the pumping wells // Azerbaijan oil industry. - 2014. - №1. - P. 26-29.
  • Gurbanov R.S., Gurbanova T.G. Gas-hydrodynamic technology for studying the reservoir drainage zone using a pumping method of operation // Oilfield Business. - 2015. - № 7. -Pp. 50-53.
  • Gurbanov R.S., Gurbanova T.H. The estimation of the level of exploitation of oil reserve in the drainage area of the well // ICSCCW-2015. - Pp. 379-382.
  • Gurbanov R.S., Mamedova M.A., Gurbanova T.G. Development of a method for sealing the pump gap with well production // East European Journal of Advanced Technologies. - 2015. - № 5/1 (77). - P. 59-62.
Еще
Статья научная