Using object construction model for implementation building works management
Автор: Gusev E.V.
Рубрика: Управление в социально-экономических системах
Статья в выпуске: 3 т.19, 2019 года.
Бесплатный доступ
The main idea of the article is the importance of construction project scheduling in the construction management. Construction Execution Plan and Construction Project Schedule (which includes in the first one) are the main source of data for resolving logistical and engineering problems during the construction process. The author is analised an order of Construction Production Plan in the article. The author highlights that existing methods, which used for preparation schedule of construction project, have some limitations. It is difficult: a) to measure minimum time of overall duration of a project; b) to maximize combination between interrelated works; c) to generate object construction model. Project technological dependencies model (PTDM) is illustrated in the article. PTDM gives a view on a construction technology an object. There are the main parameters of PDTM: 1) quantitative assessments for the technological links between the works; 2) temporary range of the work; 3) criticality points for each works; 4) an overall duration of a project; 5) the maximal amount of manpower that can be used in construction an object. Using PDTM gives the opportunity: a) to determine the minimum construction time an object; b) to maximize combination between interrelated works.
Project technological dependencies model (ptdm), construction project schedule, construction production plan, construction technology, organizational technological models
Короткий адрес: https://sciup.org/147232262
IDR: 147232262 | DOI: 10.14529/ctcr190314
Список литературы Using object construction model for implementation building works management
- Polesie, P. Implementing Standardisation in Medium-Sized Construction Firms: Facilitating Site Managers' Feeling of Freedom through a Bottom-up Approach / P. Polesie, M. Frödell, P.E. Josephson // Proceedings for the 17th Annual Conference of the International Group for Lean Construction. Taipei, Taiwan, 15-17 July 2009. - P. 317-326.
- Бородин, С.И. Понятие и функции застройщика на рынке жилищного строительства / С.И. Бородин // Экономика строительства. - 2011. - № 3. - С. 50-53.
- Gusev, E.V. Construction and assembly works planning: optimization or search for solutions / E.V. Gusev // 3-rd International Conference on Industrial Engineering (ICIE-2017). SHS Web Conf. - 2017. - Vol. 35. DOI: 10.1051/shsconf/20173501147
- A review of methods and algorithms for optimizing construction scheduling / J. Zhou, P.E. Love, X. Wang et al. // Journal of the Operational Research Society. - 2013. - Vol. 64 (8). - P. 1091-1105. DOI: 10.1057/jors.2012.174
- Galloway, P.D. Survey of the construction industry relative to the use of CPM scheduling for construction projects / P.D. Galloway // Journal of Construction Engineering and Management. - 2006. - Vol. 132 (7). - P. 697-711. ) DOI: 10.1061/(ASCE)0733-9364(2006)132:7(697
- Caldas, C.H. Automating hierarchical document classification for construction management information systems / C.H. Caldas, L. Soibelman // Automation in Construction. - 2003. - Vol. 12 (4). - P. 395-406.
- DOI: 10.1016/S0926-5805(03)00004-9
- Improved critical chain project management framework for scheduling construction projects / G. Ma, A. Wang, N. Li et al. // Journal of Construction Engineering and Management. - 2014. - Vol. 140 (12). - P. 04014055.
- DOI: 10.1061/(ASCE)CO.1943-7862.0000908
- Mincks, W. Construction jobsite management / W. Mincks, H. Johnston. - 3th ed. - Cengage Learning, 2010. - 480 p.
- Lyapina, A.R. Use of building information modelling (BIM) in construction: the state expert inspection of construction projects in Russia / A.R. Lyapina, S.I. Borodin // Proceedings of Universities. Investment. Construction. Real Estate. - 2018. - Vol. 8, no. 2. - P. 11-17.
- DOI: 10.21285/2227-2917-2018-2-11-17
- Гусаков, А.А. Системотехника строительства / А.А. Гусаков. - М.: Стройиздат, 1983. - 368 с.
- Гусаков, А.А. Организационно-технологическая надежность строительного производства / А.А. Гусаков. - М.: Стройиздат, 1974. - 252 с.
- Baldwin, A. Handbook for construction planning and scheduling / A. Baldwin, D. Bordoli. - UK, John Wiley & Sons, 2014. - 408 p.
- DOI: 10.1002/9781118838167
- Kothari, C.R. Research methodology: Methods and techniques / C.R. Kothari. - New Delhi: New Age International, 2004. - 401 p.
- Halpin, D.W. Construction management / D.W. Halpin. - 4th ed. - John Wiley & Sons, 2011. - 448 p.
- Воропаев, В.И. Модели и методы календарного планирования в автоматических системах управления строительством / В.И. Воропаев. - М.: Стройиздат, 1975. - 232 с.
- Гусев, Е.В. Технологическое моделирование и сбалансированное планирование строительно-монтажных работ / Е.В. Гусев. - Челябинск: Редактор, 1990. - 147 с.